Current location: Home > News
News

Grey warehouse mixer renovation project started smoothly

Erdos an electric power company ash storage mixer renovation project started today.  微信图片_20210710101204.jpg


The problem solved after the modification of humidifying mixer in ash depot of thermal power plant.

1.Solve the problem of ash sticking and accumulating inside the mixer.

2. Solve the problem of frequent blade replacement of the mixer.

3.The problem of slow discharging speed of the mixer is solved, and the discharging efficiency is improved.  

4.Ensure that the main components of the mixer, drive shaft, driven shaft, central shaft, reducer, motor and base are not damaged due to internal ash accumulation.  

5.The reliability of the equipment is improved, and there is no high material level in the ash storage, which ensures the safe and stable operation of the unit in the power plant.  

STAY CONNECTED

CONTACT US

MOBLE:+86-13523322130

TEL:+86-372-5114835

FAX:+86-372-5114835  +86-372-6212640

E-MAIL:hntyhd@tyhdroller.com

WECHAT:+86-13523322130

SKYPE:hntyhd@tyhdroller.com

ADD:North of Tangyin county, Anyang, Henan, China

INQUIRY

If you have any question or comment about our products, you can reach us at

Click refresh
Copyright©http://tyhdroller.com/ Hongda Engineering Plastics Factory