Before and After Comparison for the Modification of Wet Mixer
Before | After | ||
Output | Ash discharge quantity: 3—4 Unit/h | Ash discharge quantity: 6—8 Unit/h | |
Operating Current | 50--60A,often overload | 25--30A,Stabilization | |
Blade | Cost | 800 RMB/Piece | 650 RMB/Piece |
Service Life | 2 Month | 12 Month | |
Labor Intensity | Manual Intervention required every 10 mins, 1 h for each clearance | Manual Intervention required,10 mins for each clearance. |
Before Alteration Before Alteration
After Alteration After Alteration
Conclusion the problem solved after reconstruction.
1) After modification, the problem of cement and ash in the mixer was solved.
2) To solve the problem of frequent replacement of blades after renovation.
3) Solve the problem of slow unloading speed of the mixer and improve the unloading efficiency.
4) After the modification, the main parts of the mixer, the driven shaft, the driving shaft, the center shaft, the reducer, the motor and the base shall not be damaged due to the internal accumulation of ash.
5) The reliability of the equipment has been improved after the renovation, and there is no high material position in the ash warehouse to ensure the safe and stable operation of the plant.
In the process of operation, a lot of practice proves that the transformation is very successful, which reduces the labor intensity of the workers, increases the production safety, reduces the maintenance of the equipment, and improves the operation reliability of the equipment.